Toppers/chassis mounts

Chassis/Topper In Construction
  • 1.5 x1.5Aluminum Tubing Superstructure
  • 20 Gauge Stainless Skin Inside/Out
  • 12 Gauge Stainless Doors
  • 4″ Insulation In Roof; 1.5″ In Floor and Front Wall; 2″ In Rear Wall
  • Double Wall Stainless Partitions with SS Jailbarsat Top 11″ Of Each Wall
  • Aluminum Diamond Plate Roof
  • Aluminum Round Corner With Drip Rail
  • Adjustable Door Vents
  • Locking T Handles
Included Equipment
  • 1650 CFM Exhaust Fan
  • Aluminum Top Rack
  • LED Airing Lights-2
  • Safety Latches